+1 (800) 365-2811  |  [email protected] EN  |  Formwork engineering desk open weekdays

Contact Doka

Request a formwork quote, material list, or engineering consult. Share pour height, cycle targets, and site constraints so we can reply with a usable package.

Desk hoursMon–Fri 8:00–18:00 local project time
Typical replyWithin 2 business days on complete packages
Map illustration of Doka project support office district

Visit / Mail

Doka Project Support Desk
2400 Formwork Drive, Suite 400
Chicago, IL 60601, USA

Hours

Monday–Friday: 8:00am–6:00pm
Saturday: engineering by appointment
Sunday: closed

The project desk coordinates quotes for wall, slab, climbing, and scaffolding packages. Distributors may handle local inventory, but questions about load bearing capacity, H20 beam layouts, and pour-pressure assumptions can start here so your temporary works stay consistent across floors.

When you write, name the concrete grade, planned lift height, and whether the structure uses climbing formwork, slab tables, or conventional wall gangs. Estimators who attach a rough material list receive clearer accessory counts for ties, walers, and scaffolding interfaces. Site managers who flag crane capacity and yard space help us sequence deliveries so early lifts do not starve later decks.

Tell Us About Your Pour

Include storey counts, pier geometry, or mat volume. Note whether you need climbing formwork, slab tables, or accessories only. We typically reply within two business days.

  • System selection for cores, decks, and pits
  • Material lists your estimator can price
  • Jobsite start-up coaching on request

For high-rise packages, share wind-stage assumptions and crane capacity. For bridges, note traffic staging and falsework clearance. For industrial mats, include pour rate so we can check panel ratings against compressive strength paths and impact from continuous vibration.

Prefer phone? Call +1 (800) 365-2811 on weekdays. Prefer drawings first? Attach notes in the form and mark “material list” in the project description. Either path reaches the same Doka engineering desk that supports global formwork inquiries on dokamaterials.com.

If your temporary works package mixes rental fleet panels with purchased H20 beams, say so up front. Mixed fleets need dimensional checks before the first pour; waiting until formwork is on site usually costs a cycle day. We can also review fire resistance rated platform decks and edge protection details when your safety plan requires documented access around live walls.

Regional partners may stage inventory closer to your jobsite, yet engineering assumptions stay with Doka: published load paths, reuse limits, and strike sequences. That split keeps logistics flexible without letting pour-pressure guesses drift between floors.